Annual Maintenance; Power Distribution System Maintenance - Huawei UPS5000-E Series User Manual

Integrated ups, 50/125 kva
Hide thumbs Also See for UPS5000-E Series:
Table of Contents

Advertisement

UPS5000-E-(50 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
Item
Shallow discharge test
(recommended)

6.2.4 Annual Maintenance

Table 6-7 Annual maintenance
Item
Capacity Test
Battery
connection
reliability

6.3 Power Distribution System Maintenance

O&M Personnel Skill Requirements
O&M personnel must be qualified power distribution system engineers who are familiar with
the data center power supply and distribution system configurations and the operations for
each core component.
Issue 09 (2019-12-20)
Expected Result
Conduct a shallow discharge
test when the UPS is backed
up to verify that the batteries
can discharge normally.
Expected Result
When the UPS is backed up,
discharge a battery to the
undervoltage alarm threshold, to
refresh the capacity of the battery.
1. Each battery terminal is
connected reliably. (When
battery strings are powered
off, check the reliability of
each terminal in the order
from positive terminals to
negative terminals.)
2. The tightening torque of each
battery screw meets the
requirements of the battery
manufacturer. (A torque
wrench is used for checking
the torque. After checking that
the battery screws meet the
requirements, mark the screws
for later check.)
Copyright © Huawei Technologies Co., Ltd.
6 Routine Maintenance
Troubleshooting
Huawei technical support.
1. If the batteries cannot
discharge normally, locate
the fault (for abnormal
alarms, see the alarm list).
2. If the fault persists, contact
Huawei technical support.
Troubleshooting
1. Locate the cause when an
exception is identified.
2. If the fault persists, contact
Huawei technical support.
1. Rectify any abnormal
connection.
2. If the fault persists, contact
Huawei technical support.
207

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents