Monitoring The Supervisor 250G In The Cisco Cbr Chassis Using Leds - Cisco cBR Series Hardware Installation Manual

Converged broadband routers
Hide thumbs Also See for cBR Series:
Table of Contents

Advertisement

Monitoring the Supervisor in the Cisco cBR Chassis
Monitoring the Supervisor 250G in the Cisco cBR Chassis Using
LEDs
Table 39: Verifying the LEDs on the Supervisor Card
LED
PWR STAT
RP STAT

Monitoring the Supervisor 250G in the Cisco cBR Chassis Using LEDs

Status
Off
Green
Yellow
Blinking green at a 2 seconds rate
Blinking yellow at a 2 seconds rate
Blinking between green and yellow
at a 2 seconds rate
Blinking yellow at a 1/4 second rate
Blinking green at a 1/4 second rate
Blinking between green and yellow
at a 1/4 seconds rate
Off
Blinking green
Green
Yellow
Cisco Converged Broadband Routers Hardware Installation Guide
Description
Supervisor Card is not powered up.
Supervisor Card is powered up.
Supervisor Card has a power fault
- at least one voltage rail exceeded
its voltage threshold limit.
Supervisor Card has a power fault
- less than the minimum number of
fan modules with no fault condition
detected at power-on.
Supervisor Card has a power fault
- less than the minimum number of
power modules with no fault
condition detected at power-on.
Supervisor Card has a power fault
- the Supervisor PIC is not detected
at power-on.
Supervisor Card has a power fault
- either the Supervisor PIC,
SUP-DC, or SUP-MB did not
respond with a PGOOD signal
within 3 seconds after power-on.
Software on the other Supervisor
Card has turned off power on this
Supervisor Card.
Secure Boot authentication has
failed and Supervisor Card is
powered down.
RP has not booted.
Software is loading.
RP is operational.
RP has detected a fault.
179

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbr-8

Table of Contents