Removing The Supervisor Pic Cable Management Bracket - Cisco cBR Series Hardware Installation Manual

Converged broadband routers
Hide thumbs Also See for cBR Series:
Table of Contents

Advertisement

Maintaining the Supervisor in the Cisco cBR Chassis
Figure 135: Removing the 40-Gigabit QSFP+ or 100-Gigabit QSFP28 Transceiver Module
Step 4
Place the QSFP+ or QSFP28 transceiver module into an antistatic bag.
What to do next
Replace the QSFP+ or QSFP28 module

Removing the Supervisor PIC Cable Management Bracket

The Supervisor PIC cable management bracket is usually removed when the Supervisor PIC needs to be
replaced.
Before you begin
• Attach an ESD-preventive wrist strap to your wrist and connect the other end to the grounding lug
• Remove all the cables that are routed through the Supervisor PIC cable management bracket.
Required Tools and Equipment
• ESD-preventive wrist strap
• 3/16" flat-blade screwdriver
Step 1
Loosen the two captive screws that secure the Supervisor PIC cable management bracket using a 3/16" flat-blade
screwdriver.
connected to the chassis.
Removing the Supervisor PIC Cable Management Bracket
(if required).
Cisco Converged Broadband Routers Hardware Installation Guide
211

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbr-8

Table of Contents