Using the DTI Ports on the Supervisor PIC

Figure 54: LC fiber-optic connector
What to do next
Route the fiber-optic cables through the Supervisor PIC cable management bracket and chassis-mounted
fiber/cable routing
Using the DTI Ports on the Supervisor PIC
Before you begin
Required Tools and Equipment
• RJ-45 cable
• Clock source (DTI server)
Step 1
Connect one end of the RJ-45 cable to the DTI port on the Supervisor PIC.
Figure 55: DTI Port Connection on the Supervisor PIC
Step 2
Connect the other end of the RJ-45 cable to the to the DTI server as a reference clock source.
What to do next
Route the RJ-45 cable through the Supervisor PIC cable management bracket and chassis-mounted fiber/cable
routing
Cisco Converged Broadband Routers Hardware Installation Guide
98
guide.
Install the Supervisor
PIC.
Install the Supervisor
Card.
guide.
Installing the Supervisor in the Cisco cBR Chassis