Installing The Cisco Cbr Chassis - Cisco cBR-8 Installation Instructions Manual

Cbr series converged broadband routers
Table of Contents

Advertisement

Revised: May 28, 2015,

Installing the Cisco cBR Chassis

Installation Methods
The Cisco cBR-8 router can be either mounted on the rack at the front or in the middle. Also, the router can be either mounted on a
standard 19-inch wide four-post equipment rack unit or a two-post rack unit.
The Cisco cBR-8 router usually ships fully loaded. Due to a fully configured system weighing approximately
Note
430 lbs, components must be removed from the chassis to make the chassis lighter for rack installation.
Remove all power supplies, supervisor cards, line cards, rear PIC cards and fan modules before
rack-mounting to reduce the weight to approximately 117 lbs. For instructions on how to remove the
components, see the monitoring sections.
Note
Make sure you place the cards and modules in an anti-static bag until you install the chassis in the rack.
Verifying Rack Dimensions
Before You Begin
Before you install the chassis, measure the space between the vertical mounting flanges (rails) on your equipment rack to verify that
the rack conforms to the measurements shown in the figure below.
Figure 1: Equipment Rack Dimensions
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents