Maintenance area
Issue 02 (2016-11-15)
Item
Circuit breakers after
power-off
Cable insulation
performance after
power-off
Insulation
performance of the
power distribution
subrack after
power-off
Insulation resistance
of the secondary
loop after power-off
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Operation
Expected Result
Switch on or off the
The circuit
circuit breakers.
breakers are
switched on and
off smoothly for
five times.
Measure the
The insulation
insulation resistance
resistance is greater
using an insulation
than or equal to 5
tester.
megohms.
Measure the
The insulation
insulation resistance
resistance is greater
using an insulation
than or equal to 10
tester.
megohms.
Measure the
The insulation
insulation resistance
resistance is greater
using an insulation
than or equal to 2
tester.
megohms.
A Preventive Maintenance Table
Troubleshootin
g
If the circuit
breaker cannot be
switched on or off
smoothly, perform
the following
operations:
If there is a
spare circuit
breaker,
connect cables
to it.
If there is no
spare circuit
breaker,
replace the
power
distribution
subrack by
referring to
5.2.5
Replacing a
Power
Distribution
Subrack.
If the cable
insulation
performance is
poor, replace the
cable.
If the insulation
performance is
poor, check and
maintain the
components in the
power distribution
subrack, such as
internal cables and
circuit breakers.
If the insulation
performance is
poor, check and
maintain the
signal cable,
emergency fan,
and smart ETH
gateway.