Mercury 225 EFI Service Manual page 681

3.0 litre work, electronic fuel injection
Hide thumbs Also See for 225 EFI:
Table of Contents

Advertisement

ATTACHMENTS / CONTROL LINKAGE
STEERING LINK ROD INSTALLATION
Steering link rods MUST BE secured between outboard steering arm and steering
cable end, using special washer head bolt (10-849838) and two nylon insert lock-
nuts (11-826709113), as shown. Both special washer head bolt and nylon insert
locknuts MUST BE tightened as specified.
f
b
c
d
a -
b -
c -
d -
e -
Lubricate holes in ends of steering cables, with 2-4-C Marine Lubricant with Teflon. As-
semble steering link rods to steering cable ends of each outboard, using flat washers and
nylon insert locknuts. Tighten locknuts until they seat [DO NOT exceed 120 Ib. in. (13.5
Nm) of torque], then back nut off 1/4 turn.
Lubricate ball joints in steering link rods with SAE 30W Motor Oil (obtain locally). Secure
link rods to outboard steering arms, using special washer head bolts (10-849838) pro-
vided and nylon insert locknuts as shown. Torque special bolts to 20 Ib. ft. (27 Nm) then
torque locknuts to 20 Ib. ft. (27 Nm).
Page 7-14
e
a
a
e
a
b
f
Flat Washer (2 Each Link Rod)
Nylon Insert Locknut - Torque Until it Seats [DO NOT Exceed 120 lb. in. (13.5
Nm) of Torque], Then Back Off 1/4 Turn
Special Washer Head Bolt (10-849838) - Torque to 20 lb. ft. (27 Nm)
Nylon Insert Locknut - Torque to 20 lb. ft. (27 Nm)
Steering Link Rod
f -
Steering Cable End
WARNING
c
d
c
d
e
50061
e
a
b
f
28166
90-884294 OCTOBER 2001

Advertisement

Table of Contents
loading

This manual is also suitable for:

250 efi3 liter work 225 efi3 liter work 250 efi

Table of Contents