Removal and Replacement Procedures
Post-Repair Procedures
Step 14. Once all the files are filled in, press the Write to chassis button to program the
values and information into the chassis.
Step 15. OF Ingot Utilities can be closed now, all the configuration has been
completed.
Step 16. Reboot the USB-VNA.
Shutdown the USB-VNA and unplugged the power cord. Wait for a few
second before power up again. The PC should able to identify the USB-VNA at
the right bottom of the PC screen.
Step 17. Install back the Multiple License Files.
This step is only required if you are replacing the chassis. If you are
replacing only the module, skip this step.
All of the licenses in your UBS VNA need to be re-host to the new hostID .
Contact Keysight Technologies factory support early in your repair process
to receive your licenses in a timely manner. See
page
Keysight P937xA PXIe Service Guide
22.
"Contacting Keysight" on
83