Replacement Procedure - Keysight P937 A Series Service Manual

Streamline usb vector network analyzers
Table of Contents

Advertisement

Removal and Replacement Procedures
Connector Replacement Procedure
Figure 5-2
Removing the Nut
3. Use the torque wrench with the adapter to remove the nut.
4. Use the torque wrench to remove the connector. Refer to
Figure 5-3
Removing the Connector

Replacement Procedure

1. Reverse the order of the removal procedure.
2. Perform the Op Check to verify the new connectors are functional. Refer to
3. For complete assurance that the connectors are meeting all criteria,
If any of the tests fail, perform the Adjustments (refer to
page
64
Be careful to install the nut with the slots facing outward.
"The Operator's Check" on page
(refer to
"Adjustments" on page
perform the following TME Performance Tests. Refer to the TME webpage
at http://cal.software.keysight.com:
— "Source Power Accuracy Test"
— "Source Maximum Power Output Test"
— "Calibration Coefficients Test"
48), then repeat the tests.
33. If it fails, perform the Adjustments
48), then repeat the Op Check.
"Adjustments" on
Keysight P937xA PXIe Service Guide
Figure
5-3.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9370aP9372aP9373aP9374aP9375aP9371a

Table of Contents