Removal and Replacement Procedures
Connector Replacement Procedure
Figure 5-2
Removing the Nut
3. Use the torque wrench with the adapter to remove the nut.
4. Use the torque wrench to remove the connector. Refer to
Figure 5-3
Removing the Connector
Replacement Procedure
1. Reverse the order of the removal procedure.
2. Perform the Op Check to verify the new connectors are functional. Refer to
3. For complete assurance that the connectors are meeting all criteria,
If any of the tests fail, perform the Adjustments (refer to
page
64
Be careful to install the nut with the slots facing outward.
"The Operator's Check" on page
(refer to
"Adjustments" on page
perform the following TME Performance Tests. Refer to the TME webpage
at http://cal.software.keysight.com:
— "Source Power Accuracy Test"
— "Source Maximum Power Output Test"
— "Calibration Coefficients Test"
48), then repeat the tests.
33. If it fails, perform the Adjustments
48), then repeat the Op Check.
"Adjustments" on
Keysight P937xA PXIe Service Guide
Figure
5-3.