Verifying Parameters Of Board And Project; Resetting Board - Mitsubishi Electric MELSEC SW1DNC-CCIEF-B User Manual

Cc-link ie field network interface board
Table of Contents

Advertisement

11.3

Verifying Parameters of Board and Project

This section explains a method for verifying parameters set to the board and parameters of open project.
Use this function to check if the parameters of the projects are the same, or to check the changed parameter locations.
To verify two projects, perform the project verification. (Page 97 Verifying Project Data)
Operating procedure
1.
Select [Online]  [Verify with Board]
The verify result is displayed on the "Verify Result" screen.
11.4

Resetting Board

This section explains a method for resetting the board from CC IE Field Utility.
Window
[Online]  [Reset Operation]
Operating procedure
1.
Check the check box of the board to be reset.
2.
Click the [OK] button.
The selected board is reset.
11 OPERATING BOARD ONLINE
114
11.3 Verifying Parameters of Board and Project

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec q80bd-j71gf11-t2Melsec q81bd-j71gf11-t2

Table of Contents