Beckhoff EL34 Series Documentation page 270

3-phase energy and power measurement terminals
Table of Contents

Advertisement

Application examples
Fig. 172: Selection of predefined PDO Assignment "Dafault + Variant"
• after downloading (see below) and importing PLCopenXML
Fig. 173: Import of PLCopenXML
• the function block variables must be linked to the corresponding terminal PDOs.
270
Version: 1.5
EL34xx

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents