Beckhoff EL34 Series Documentation page 133

3-phase energy and power measurement terminals
Table of Contents

Advertisement

Predefined PDO Assignment
The "Predefined PDO Assignment" enables a simplified selection of the process data. The desired function is
selected on the lower part of the "Process Data" tab. As a result, all necessary PDOs are automatically
activated and the unnecessary PDOs are deactivated.
The following PDO assignments are available:
EL3423
Name
SM2, PDO assignment
Default
-
Default + Statistics
-
EL34xx
SM3, PDO assignment
0x1A00 (L1 Status)
0x1A03 (L1 Energy)
0x1A0A (L2 Status)
0x1A0D (L2 Energy)
0x1A14 (L3 Status)
0x1A17 (L3 Energy)
0x1A1E (Total Total Status)
0x1A21 (Total Total Active)
0x1A22 (Total Total Apparent)
0x1A23 (Total Total Reactive)
0x1A00 (L1 Status)
0x1A03 (L1 Energy)
0x1A06 (L1 Statistic Voltage)
0x1A0A (L2 Status)
0x1A0D (L2 Energy)
0x1A10 (L2 Statistic Voltage)
0x1A14 (L3 Status)
0x1A17 (L3 Energy)
0x1A1A (L3 Statistic Voltage)
0x1A1E (Total Total Status)
0x1A20 (Total Total Advanced)
0x1A26 (Total Total Statistic Power)
0x1A27 (Total Total Statistic PQF)
0x1A28 (Total Total Interval Energy)
Version: 1.5
Commissioning
133

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents