Download Print this page

Rh-6Frh Series - Mitsubishi Electric RH-FRH Series Instruction Manual

Industrial robot arm setup & maintenance
Hide thumbs Also See for RH-FRH Series:

Advertisement

(5) RH-6FRH series

Refer to
Page 30, "(3) Installation procedure"
16
are correspond to the same numbers in
Turn the controller's power OFF before this operation. Refer to
for removing/ installing the cover.
No.2 arm cover U
2)、 12)
Connect inside the No.
2 arm cover U
8)
(c)
Fig.2-16 : Installation of air hoses and cables inside the robot's shaft (RH-6FRH series)
and install cables and air hoses correctly. The numbers in
"(3)Installation
5)、 9)
Match up the peak of the air
hose and cable with the top
end of the fixing plate
3)
9)
Seal the outlet with the liquid gasket.
(Only for clean/oil mist specification)
9)
Fixing air hoses and
cables inside a hand.
procedure".
Page 101, "5.3.2 Installing/removing the cover"
Silicone grease application places
10)
(a)
6)
(b)
1)
Top end of the
J3 axis operat -
ing range
11)
Perform the operation of the
J3 and J4 axes, and check
that no interference occurs.
2Unpacking to Installation
Fig. 2-
4)
Approx. 10mm
Expanding sleeve
J3 axis
J4 axis
Installation 2-32

Hide quick links:

Advertisement

loading