Rh-3Frhr Series - Mitsubishi Electric RH-FRH Series Instruction Manual

Industrial robot arm setup & maintenance
Hide thumbs Also See for RH-FRH Series:

Advertisement

2Unpacking to Installation

(2) RH-3FRHR series

Fig.2-7 : Installation dimensions (RH-3FRHR series)
1) The robot installation surface has been machine finished. Use the installation holes (4-φ9) opened at the
four corners of the base, and securely fix the robot with the enclosed installation bolts (hexagon socket
bolts).
2) Install the robot on a level surface.
3) It is recommended that the surface roughness of the table onto which the robot is to be installed by Rz25 or
more. If the installation surface is rough, the contact with the table will be poor, and positional deviation
could occur when the robot moves.
4) When installing, use a common table to prevent the position of the devices and jigs subject to robot work
from deviating.
5) The installation surface must have sufficient strength to withstand the arm reaction during operation, and
resistance against deformation and vibration caused by the static (dynamic) load of the robot arm and
peripheral devices, etc.
6) If you operate the robot at a high speed, reaction forces are applied to the installation stand by the robot's
operation. Make sure that the installation stand on which the robot is placed has sufficient strength and
rigidity.
Table 2-5
stand. Please use these values as reference when designing the installation stand.
Installation
2-17
F
F
H
F
H
shows the maximum reaction force (design values) that may be applied to an installation
V
M
T
M
L
F
H
M
L
F
H
F
V
Note1) General environment type:
180mm
Clean/waterproof specification:
200mm
Note2) The interference of installation bolt
and No.1 arm may occur depending on
the size of installation stage. Take care
against interference of installation bolt,
such as inserting the installation bolt
from the bottom.