Operator & Service Manual
11.8.10.1 Place O-Ring in the Ring Sleeve.
11.8.10.2 Align & slide the 3 O-RINGS in the Ring SLEEVE over the 3 STRUTS.
11.8.10.3 Place the Inlet Cap (9756-SEQ) over the STRUTS
so that the LCD Display is lined up with the Membrane Panel
Window.
11.8.10.4 Connect the Breath Detect Tube.
11.8.10.5 Insert Power Harness wires from the Inlet Cap and
tighten the screws to 4.4 in-lbs.
NOTE: Battery wire polarity indicated on the PCBA. Red is (+) and
Black is (-).
11.8.10 INLET CAP INSTALLATION (9756-SEQ)
Figure 11-77. O-ring attached
Figure 11-78. Inlet Caps
Figure 11-79. Breach Tube
power
harness
Figure 11-80. Power Harness Wires
O-Ring
(9374-SEQ)
Ring Sleeve
(9928-SEQ)
9928-SEQ
breath
detect
tube
9735-SEQ H | 71