Installation Of Pcb Assembly; Figure 11-60. Secure; Figure 11-61. Connect; Figure 11-62. Screws - Saros 9400R-SEQ Operators & Service Manual

Table of Contents

Advertisement

11.8.6.2 Secure the Flow Tube with a Cable Tie to the Propor-
tional valve.
11.8.6.3 Connect Proportional Valve wire to the PCB Assembly
NOTE: A flow calibration procedure is required after replacing <the ATF or Compressor, the PCB Circuit Board, the Proportional Valve>
If this components is replaced, the SAROS must be returned to CAIRE or a factory-authorized service center to have the flow calibra-
tion performed before returning to use.
11.8.7.1 Position the PCB Assembly between the 2 STRUTS
(9779-SEQ & 9780-SEQ). Install 2 Screws on each side and
torque the Screws to 6.0 in-lbs.
66 | 9735-SEQ H
proportional

11.8.7 INSTALLATION OF PCB ASSEMBLY

Figure 11-60. Secure

valve
connector

Figure 11-61. Connect

Figure 11-62. Screws

Operator & Service Manual
cable
tie
screws
9912-1-SEQ

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents