Power Connector Replacement (9766-Seq); Figure 11-69. Cable Ties; Figure 11-70. Top Strut; Figure 11-71. Remove Screws - Saros 9400R-SEQ Operators & Service Manual

Table of Contents

Advertisement

Operator & Service Manual
11.8.7.9 Add Cable Tie to hold wires away from the coil. Hand-
tighten loose as in Figure below.
11.8.7.10 Attach Top STRUT (9778-SEQ) with 5 screws as shown on figure below. Torque the screws to 6.0 in-lbs.
11.8.8.1 After performing steps 11.7.1.1 thru 11.7.1.8 from "INLET CAP REMOVAL"
11.8.8.2 Remove the four screws (9203-2-SEQ) and remove the
Power Connector (9766-SEQ).
11.8.8.3 Install new Power Connector (9766-SEQ). Use Loctite
222 on the four mounting screws. Replace O-Ring (9916-3-
SEQ) if necessary.
11.8.8.4 Perform steps 11.8.10.4 – 11.8.10.11 from section "Inlet
Cap Installation".
screws
(9912-1-SEQ)

Figure 11-70. Top strut

11.8.8 POWER CONNECTOR REPLACEMENT (9766-SEQ)

cable tie
(6968-SEQ)

Figure 11-69. Cable Ties

STRUT
(9978-SEQ)
power connector
(9766)

Figure 11-71. Remove screws

Figure 11-72. Power Connector

screws
9735-SEQ H | 69

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Saros 9400R-SEQ

Table of Contents