Operator & Service Manual
11.7.8.5 Cap both ATF ports (Feed and Vacuum ports).
Cap 2X
Figure 11-37. ATF ports
11.7.8.6 Remove the ATF Bulkhead FROM the bottom of the
ATF Module Assembly as shown in figure below.
ATF module assy
(9729-SEQ)
NOTE: Mark the position for installation.
ATF bulkhead assy
(9922-SEQ)
Figure 11-38. ATF bulkhead
11.8 INSTALLATION PROCEDURES
11.8.1 GENERAL PROCEDURE
11.8.1.1 Thread Locking Procedure: When applying thread
locker to screws, apply 1 drop of the appropriate thread locking
Thread Locker
fluid to the first four threads of the screw/standoffs as show in
the figure below. The Loctite 222MS will be used unless speci-
fied otherwise.
Figure 11-39. Thread Locking Procedure
11.8.1.2 CABLE TIE INSTALLATION PROCEDURE: All
cable ties will be installed using cable tie gun unless specified
otherwise.
Figure 11-40. Cable tie installation
9735-SEQ H | 59