11.8.4.1 Secure two Cable Ties through the holes in LEFT STRUT (9779-SEQ) and round all wires.
Secure two Cable Ties around all wires (battery cables & ATF Bundle).
Apply one Cable Tie around all battery cables, close to the battery board, as in Figure below.
NOTE: Leave the Cable Ties loose in case slack is needed at the PCBA assembly.
NOTE: Ensure slack to wires where indicated.
Orient the Cable Tie knots towards the Compressor.
11.8.4.2 Wrap the Wire Sleeve around the ATF wires and pass thru the Bulkhead.
Pass the two Battery wires from the Battery Connector thru the Bulkhead as shown in figure below.
3" wire sleeve
(9638-SEQ)

11.8.4 BATTERY CABLE INSTALLATION

ATF wires
go through slot
cable ties (6968-SEQ)
secure all cables

Figure 11-52. Cable Tie Knots

Figure 11-53. Wire Sleeve

cable ties (6968-SEQ)
through STRUT holes
cable tie
(6968-SEQ)
ATF power &
ATF thermistor
wires
battery
connector
cable (9201-SEQ)
9735-SEQ H | 63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents