11.8.4.3 Secure the Battery Power wires on the LEFT STRUT (9779-SEQ) with Cable Tie.
NOTE: Leave the Cable Ties loose in case slack is needed at the PCBA assembly.
NOTE: Ensure slack to wires where indicated.
Orient the Cable Tie knots towards the Compressor.
11.8.4.4 Secure the ATF Bundled wires to the Battery Power Cables with cable ties.
NOTE: Leave the Cable Ties loose in case slack is needed at the PCBA assembly.
11.8.4.5 Ensure that there is slack on the wires on the areas indicated.
11.8.4.6 Install the Grommet onto the Bulkhead to secure the
ATF and Battery wires.
Route the Battery Power wires and Hall Effect wire under the
mounting Compressor screw and through the Bulkhead grommet
as shown in figure below.
Route the ATF wire bundle under the STRUTS prior to rail in-
stallation and through the Bulkhead grommet as shown in figure
below.
NOTE: Do not pinch Thermistor Cable in bulk head.
64 | 9735-SEQ H
cable ties
v slack
6968-SEQ
Figure 11-54. Secure Battery Wires
v slack
Figure 11-55. Slack
Operator & Service Manual
cable ties 6968-SEQ
ATF power & ATF thermistor
wires from battery connector
hall effect sensor
compressor
& battery power wires
power
Figure 11-56. Secure ATF
thermistor
wires
v slack