Boom and Transfer
6-80
4
3
2
#
Description
1 Roller Bushing
2 Washer
3 Capscrew
4 Right Hand Hose Guide
5 Hose Guide Spacer
6 Hose Spacer
7 Plastic Bushing
8 Left Hand Hose Guide
Fig. 6-86: Chain and Hose Guide Assembly
37. (Ref. Fig. 6-86) Remove chain and hose guide assembly from rear of
middle (rear) boom section as follows:
a. Remove chain and hose roller shaft (Item 13) from rear of middle
(rear) boom section. Remove chain and hose roller assembly.
b. Remove two (2) lock nuts (Item 9) and capscrews (Item 3).
c. Separate two (2) each right hand hose guides (Item 4), washers
(Item 2), roller bushings (Item 1), hose guide spacers (Item 5),
hose spacers (Item 6), plastic bushings (Item 7), and left hand
hose guides (Item 8) from chain and hose roller (Item 12).
d. Remove two (2) chain roller washers (Item 10) and the hardened
bushing (Item 11) from the chain and hose roller.
5
6
9
7
8
10
11
12
1
13
14
15
#
9 Lock Nut
10 Chain Roller Washer
11 Hardened Bushing
12 Chain and Hose Roller
13 Chain and Hose Roller Shaft
14 Grease Fitting
15 Grease Fitting Cover
9
10
4
7
5
6
1
2
8
Description
31200079
3