Fig. 6-107: Front Slide Pad Installation - Outer And Middle (Rear) Boom Sections - JLG Lull 1044C-54 II Series Service Manual

Table of Contents

Advertisement

Boom and Transfer
6-100
35. (Ref. Fig. 6-106) Install slide pad retainers (Item 3) with flatwashers
(Item 4), lockwashers (Item 5), and capscrews (Item 6). Torque
capscrews to 200 ft-lbs.
6
5
4
3
2
1
5
6
4
3
2
1
#
Description
1 Capscrew
2 Lockwasher
3 Flatwasher
4 Slide Pad Retainer
5 Shim
6 Slide Pad
7 Retainer Block
Fig. 6-107: Front Slide Pad Installation – Outer and Middle (Rear) Boom
36. (Ref. Fig. 6-106) Install two (2) retainer blocks (Item 7) on front of outer
boom section (Item 13) with lockwashers (Item 10) and capscrews
(Items 11 and 12). Torque capscrews (Item 11) to 90 ft-lbs and
capscrew (Item 12) to 200 ft-lbs.
37. (Ref. Fig. 6-106) After applying thread locking compound to the
capscrews, install remaining slide pads (Item 6) and shims (Item 5) on
front of outer and middle (rear) boom sections with lockwashers
(Item 9) and capscrews (Item 8). Torque capscrews to 180 in-lbs.
38. (Ref. Fig. 6-106) Install remaining slide pad retainers (Item 4) with
flatwashers (Item 3), lockwashers (Item 2), and capscrews (Item 1).
Torque capscrews to 200 ft-lbs.
8
9
8
9
7
5
5
10
6
12
10
10
11
11
7
10
1
#
8 Button-Head Socket Capscrew
9 Lockwasher
10 Lockwasher
11 Capscrew
12 Capscrew
13 Outer Boom Section
14 Middle (Rear) Boom Section
Sections
13
14
6
8
9
4
2
5
6
6
10
11
5
Description
31200079
8
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents