Fig. 6-61: Cylinder Pivot Pins - JLG Lull 1044C-54 II Series Service Manual

Table of Contents

Advertisement

31200079
8. (Ref. Fig. 6-60) Tag and disconnect two (2) hoses at boom extension
cylinder lines (Item 3). Cap lines and hoses
9. Tag and disconnect two (2) carriage tilt hoses (Item 2), and two (2)
auxiliary hydraulics hoses (Item 1) at the boom. Cap hoses and lines.
10. Place sling around inner boom section, at the front. Chains with hooks
may be attached to the rear of the outer boom section, near the pivot
pin bosses (Ref. Fig. 6-61). Attach sling and chains to crane hook and
lift crane to support weight of boom.
CAUTION: Make sure crane, slings, and chains have sufficient capacity to
support the weight of the boom. A 4-section boom assembly,
including boom extension cylinder, weighs approximately
6,650 pounds.
8
7
#
Description
1 Lock Pin
2 Lockwasher
3 Bolt
4 Pivot Pin, Rear Carriage Tilt Cyl.
11. (Ref. Fig. 6-61) Remove four (4) capscrews (Item 3) and lockwashers
(Item 2) from lock pins (Item 1) securing rear carriage tilt cylinders
(Item 6) and boom hoist cylinders (Item 7) to the boom (Item 8).
Remove four (4) lock pins from pivot pins (Items 4 and 5).
Hook chains at
these areas
1
1
2
5
#
5 Pivot Pin, Boom Hoist Cylinder
6 Rear Carriage Tilt Cylinder
7 Boom Hoist Cylinder
8 Boom

Fig. 6-61: Cylinder Pivot Pins

Boom and Transfer
2
3
4
3
6
Description
6-57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents