Fig. 6-99: Slide Pad Installation - Middle (Forward) Boom Section - JLG Lull 1044C-54 II Series Service Manual

Table of Contents

Advertisement

Boom and Transfer
6-94
1
2
4
5
6
10
3
9
7
#
Description
1 Front Bottom Slide Pad
2 Shim
3 Pad Retainer
4 Flatwasher
5 Lockwasher
6 Capscrew
7 Side Slide Pad
8 Shim
9 Button-Head Socket Capscrew
Fig. 6-99: Slide Pad Installation – Middle (Forward) Boom Section
Note: Apply thread locking compound to all slide pad mounting capscrews before
installing them.
18. (Ref. Fig. 6-99) Install shim pads on middle (forward) boom section as
follows:
a. Install bottom slide pad (Item 17) and shim(s) (Item 16) to rear of
boom section with two (2) lockwashers (Item 15) and capscrews
(Item 14) according to drawing specifications. Torque capscrews to
180 in-lbs.
b. Install two (2) side slide pads (Item 7) and shim(s) (Item 8) to rear
of boom section with two (2) each lockwashers (Item 12) and
capscrews (Item 11) according to drawing specifications. Torque
capscrews to 180 in-lbs.
19. (Ref. Fig. 6-99) Install bottom slide pads and shims on front of boom
section as follows:
13
12
11
8
#
10 Lockwasher
11 Button-Head Socket Capscrew
12 Lockwasher
13 Middle (Forward) Boom Assy
14 Button-Head Socket Capscrew
15 Lockwasher
16 Shim
17 Rear Bottom Slide Pad
11
12
14
15
8
7
16
17
MV0150
Description
31200079

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents