Fig. 6-59: 4-Section Boom Cover Installation; Fig. 6-60: Hose Connections, 4-Section Boom - JLG Lull 1044C-54 II Series Service Manual

Table of Contents

Advertisement

Boom and Transfer
6-56
#
Description
1 Nut
2 Lockwasher

Fig. 6-59: 4-Section Boom Cover Installation

5. (Ref. Fig. 6-59) Remove six (6) each nuts (Item 1), lockwashers
(Item 2), and flatwashers (Item 3) securing boom cover (Item 4) to
boom. Remove boom cover.
6. Remove boom elevation proximity switch. See "Boom Elevation
Proximity Switch" in Section 7.
7. Remove boom extension proximity switch. See Step 8 on page 6-123.
#
Description
1 Auxiliary Hydraulic Hoses
2 Carriage Tilt Hoses

Fig. 6-60: Hose Connections, 4-Section Boom

1
2
3
#
3 Flatwasher
4 Boom Cover
2
1
4
#
3 Boom Extension Hoses
4 Boom Extension Cylinder
4
Description
3
J1220
Description
31200079