SECTION 4 - BOOM & PLATFORM
4.7 HOSE ROUTING
For proper hose routing, refer to Figure 3-19. thru Figure 3-26.
It is important to periodically inspect hoses, wraps and clamps
for proper slack adjustments and clamping integrity (pull
check). Any changes as a result of inspection should be veri-
fied by performing full strokes of boom functions especially
lift, telescope, jib, and platform rotate.
4.8 POWERTRACK MAINTENANCE
Remove Link
NOTE: Hoses shown in powertrack are for example only. Actual
hose and cable arrangements are different.
1. Clamp bar and poly roller tightly so they do not spin
when removing screw. With a small 1/4 in. ratchet and a
T-20 torx bit, remove 8-32 x 0.500 screw from one side.
4-18
2. Repeat step 1 and remove screw from other side of
track. Remove bar/poly roller from powertrack.
3121634