Second Chain Stage (T8E/T20E)5-19 - JLG TOUCAN 8E Service And Maintenance Manual

Hide thumbs Also See for TOUCAN 8E:
Table of Contents

Advertisement

REPLACE SYSTEMATICALLY BOTH CHAINS OF A SAME STAGE.
CHAIN ANCHORS, CLEVIS PINS, BEVEL WASHERS AND NUTS
MUST ALSO BE REPLACED. USE ONLY GENUINE JLG PARTS.
REMOVE THE LIFTING CHAINS ONE BY ONE. ALWAYS REPLACE
AND TENSION A CHAIN BEFORE REMOVING ANOTHER ONE. IN
ADDITION, BLOCKING SHOULD BE INSTALLED AS REQUIRED
TO SUPPORT MAST SECTIONS DURING CHAIN REMOVAL. COR-
RECTLY TAG AND DISCARD WORN CHAINS AND COMPONENTS
SO THAT THEY CANNOT BE INSTALLED ON THE WORK PLAT-
FORM OR ON ANOTHER MACHINE.
31210090
Figure 5-38. Third Chain Stage (T10E/T26E)
Second Chain Stage (T8E/T20E)
– JLG Lift –
SECTION 5 - TURNTABLE AND VERTICAL MAST
INSTALLATION OF CHAINS MUST BE DONE IN A CLEAN WORK
AREA. DO NOT REMOVE THE LUBRICANT FROM THE CHAIN
BEFORE, DURING OR AFTER THEIR INSTALLATION. WHEN
UNROLLING OR INSTALLING CHAINS, AVOID TWISTING THEM.
NOTE: As part of the lifting chain replacement procedure,
inspect condition of the pulley pins and pulleys.
Replace all damaged parts.
Rotate the turntable 90 degrees to the left to get easier
access to the mast assembly and to be able to install sup-
ports for the mast sections.
5-19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Toucan 20eToucan 10eToucan 26e

Table of Contents