Rollers, Bushings, And Shims; Fig. 6-131: Transfer Carriage - Front Rollers, Bushings, And Shims - JLG Lull 1044C-54 II Series Service Manual

Table of Contents

Advertisement

Rollers, Bushings, and Shims

Transfer Carriage
Front Mount Rollers, Bushings, and Shims
31200079
d. Secure the wiring harness and switch connection wire to the boom
with six (6) each (five on top of the boom and one inside of the
back left side of the boom) nuts (Item 4), lockwashers, (Item 3),
flatwashers (Item 2), and J-clamps (Item 1). Tighten nuts until
snug.
e. Secure the wire harness to the hydraulic tubes and hoses with wire
tires.
10. (Ref. Fig. 6-126) Install the boom cover on models with 3-section (see
Step a) or 4-section booms (see Step b).
a. Install boom cover (Item 4) on boom and secure it with four (4)
each flatwashers (Item 2), lockwashers (Item 1), and nuts (Item 3).
Torque nuts to 180 in-lbs.
b. Install boom cover (Item 4) on boom and secure it with six (6) each
flatwashers (Item 2), lockwashers (Item 1), and nuts (Item 3).
Torque nuts to 180 in-lbs.
The following procedures describe replacement of transfer rollers and
bushings for the transfer carriage along with shimming procedures and
replacement of scraper plates.
2
1
3
5
4
6
#
Description
1 Capscrew
2 Front Roller Pin
3 Lockwasher
4 Lock Pin
5 Grease Fitting
6 Grease Fitting Cover
7 Scraper Plate
Fig. 6-131: Transfer Carriage – Front Rollers, Bushings, and Shims
(Ref. Fig. 6-131) The following steps are required to replace the front
transfer rollers and bushings.
7
10
8 9
11
12
13
14
#
8 Capscrew
9 Lockwasher
10 Flatwasher
11 Roller Spacer
12 Roller Shims
13 Front Transfer Roller
14 Front Roller Bushing
Boom and Transfer
Description
6-129

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents