General Maintenance
Pipe Thread Fittings
Jump Starting Procedures
3-16
To install National Pipe Thread (NPT) fittings:
1. Apply sealant sparingly to male pipe threads only, avoiding the first few
threads at the end of the fitting.
Note:
Do not use Teflon tape or excessive amounts of sealant. System
contamination will result.
2. Install fitting and tighten per Table 3-8.
Table 3-8: Pipe Thread Fittings (Steel)
Fitting
Size
1.Turns past finger tight
CAUTION:
• Improper jump starting procedures can cause an explosion resulting in
personal injury.
• Sparks near batteries can cause explosions.
• Do not allow jump cable ends to touch each other or the machine.
• Battery acid can cause personal injury if it contacts skin or eyes.
Always wear eye protection when jump starting a machine.
• Always connect battery positive (+) to battery positive (+) and battery
negative (-) to ground on the machine. Make the final ground connec-
tion away from the battery.
• Allowing the two machines to touch during jump starting can cause
damage to bearings and electrical circuits.
• This machine has a 12 volt starting system. Use the same voltage (12
volts) for jump starting. Use of higher voltage can damage the electri-
cal system.
• Never charge a frozen battery.
Thread Size
(NPT)
-2
1/8-27
-4
1/8-27
-6
1/4-18
-8
3/8-18
-10
1/2-14
-12
3/4-14
-16
1-11.5
-20
1 1/4-11.5
-24
1 1/2-11.5
1
Turns
2–3
2–3
1.5–3
2–3
2–3
2–3
1.5–2.5
1.5–2.5
1.5–2.5
31200079