For FBD Program
From the WindLDR menu bar, select Online > Simulation > Simulation.
1.
Double-click the input FB to change the state.
2.
When you turn on both input I0 and input I1, output Q0 turns on.
•
When you turn on either input I1 or input I2, output Q1 continues to turn on and off in a one second cycle.
•
Notes:
To quit the simulation, select Online > Simulation > Simulation again.
•
You can check the state of the input connectors and output connectors of each FB. When input connectors, output connectors, and
•
connection lines are in red, they are on. Blue indicates off.
For details on the state of unconnected input connectors of the FBs, see the " SmartAXIS FBD Programming Manual".
•
WindLDR
S
AXIS P
/L
U
'
MART
RO
ITE
SER
S
M
FT9Y-B1378
ANUAL
4: O
B
PERATION
ASICS
4-13