Suzuki Wagon R Manual page 1891

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

1B-6 AIR CONDITIONING (OPTIONAL)
C
Continuity
No continuity
A
4) Install new compressor drive belt.
5) Adjust belt tension referring to above procedure.
On-Vehicle Service
Dual Pressure Switch
Inspection
1)
Check dual pressure switch (1) for continuity at normal tempera-
ture (approx. 25
charge of refrigerant and when A/C system (compressor) is
under operation. In each of these cases, switch should show
proper continuity.
2) Check switch for continuity at specified pressure as shown.
A: Approx 200 KPa (2.0 kg/cm
B: Approx 3200 KPa (32 kg/cm
D
C: Approx 260 KPa (2.6 kg/cm
D: Approx 2600 KPa (26 kg/cm
B
Pressure
A/C Compressor Relay
Inspection
1) Disconnect negative cable at battery.
2) Remove A/C compressor relay (1) from relay box (2).
3) Check resistance between each two terminals as in table
below. If check results are as specified, proceed to next
operation check. If not, replace.
º
º
C (77
F)) when A/C system has a proper
Terminals
Between A and B
Between C and D
2
)
2
)
2
)
2
)
Resistance
(infinity)
Approx. 170

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents