DTC Confirmation Procedure
1) With ignition switch turned OFF, connect scan tool.
2) Turn ON ignition switch and clear DTC using scan tool.
3) Crank engine for 3 – 5 sec.
4) Check DTC and pending DTC.
Troubleshooting
Step
1
Was "Engine and Emission Control System
Check" performed?
2
Check CKP sensor and connector for proper
installation.
Is CKP sensor installed properly and connector
connected securely?
3
Check Wire Harness and Connection.
1) Disconnect connector from CKP sensor.
2) Check for proper connection to CKP sensor at
"BLK/RED", "PNK" and "BLK" wire terminals.
3) If OK, turn ignition switch ON and check for
voltage at "BLK/RED", "PNK" and "BLK" wire
terminals of disconnected CKP sensor con-
nector. See fig. 1.
Terminal "B+": 10 – 14 V
Terminal "Vout": 4 – 5 V
Terminal "GRD": 0 V
Is check result satisfactory?
4
Was terminal "Vout" voltage in Step 3 out of speci-
fication?
5
Check Ground Circuit.
1) Turn ignition switch to OFF position.
2) Measure resistance between "BLK" wire termi-
nal of CKP sensor connector and engine
ground.
Is resistance below 5
6
Check Engine Start Signal.
1) Check voltage between "E22-35" wire terminal
of ECM connector and engine ground with
engine cranking.
Does it voltage more than 6 V?
ENGINE GENERAL INFORMATION AND DIAGNOSIS (M13 ENGINE) 6-2-113
Action
?
Yes
Go to Step 2.
Go to Step 3.
Go to Step 5.
"PNK" wire open, short or
poor connection.
If wire and connection are
OK, substitute a known-
good ECM and recheck.
Go to Step 6.
Go to Step 7.
No
Go to "Engine and
Emission Control Sys-
tem Check" in this sec-
tion.
Correct.
Go to Step 4.
"BLK/RED" and "BLK"
wire open, short or
poor connection.
"BLK" wire open or
high resistance.
"BLK/YEL" wire circuit
open, high resistance
or shorted to ground.
If wire are OK, check
starting motor refer-
ring to "Performance
Test" in Section 6G.

Hide quick links: