AMI Phosphate-II
Instrument Setup
4.2.
4.3.
Programming
A-96.250.641 / 290312
Fill / Flush Reagent System
Fill or flush the reagent tubing:
upon the initial instrument setup,
after refilling the reagent containers,
before a system shut-down to flush the system with demin
water until no more reagent is left in the system.
Service
Verification
Fill System
Cleaning
The reagent pumps are
activated for a period of
1.5 minutes.
Programming
Program all parameters for external devices (interface, recorders,
etc.) Program all parameters for instrument operation (Phosphate,
limits, alarms).
SeeProgram Overview, S. 64
see
Program List and Explanations, S. 70
3.2.2
Enter
Fill System
Progress
<Enter> to stop
Fill System
Progress
Done
3.2.2.5
3.2.2.5
Exit
Exit
Exit
Exit
and for explanations,
33