AMI Phosphate-II
Instrument Setup
4.2.
4.3.
Programming
A-96.250.641 / 290121
Fill or Flush Reagent System
Fill or flush the reagent tubing:
upon the initial instrument setup,
after refilling the reagent containers,
before a system shut-down to flush the system with demineral-
ized water until no more reagent is left in the system.
Service
Verification
Fill System
Cleaning
Fill System
Progress
<Enter> to stop
Fill System
Progress
Done
Programming
Program all parameters for external devices (interface, recorders,
etc.) Program all parameters for instrument operation (Phosphate,
limits, alarms). See
Navigate to menu <Maintenance>/
3.2.2
<Service>/<Fill system>.
Press [Enter].
The peristaltic pump is activated for
3.2.2.5
1.5 minutes.
Press [Exit] 4 times to return to the
3.2.2.5
operating display mode.
Program List and Explanations, p.
66.
31