Fill Or Flush Reagent System; Programming - Swann AMI Codes-II CC Operator's Manual

Monitoring system for the automatic, continuous measurement and dosing control of chlorine based on the dpd colorimetric method apha 4500 cl-g and on en iso 7393-2
Table of Contents

Advertisement

AMI Codes-II CC
Instrument Setup
4.4.
4.5.

Programming

38

Fill or Flush Reagent System

Fill or flush the reagent tubing:
 upon the initial instrument setup,
 after refilling the reagent containers,
 before a system shut-down to flush the system with deminer-
alized water until no more reagent is left in the system.
Service
Verification
Fill System
Cleaning
Fill System
Progress
<Enter> to stop
Fill System
Progress
Done
1 Check tubing and flow cell for leaks and repair if necessary.
2 Let the instrument run continuously for 1 hour.
Programming
Program all parameters for external devices (interface, recorders,
etc.)
Program all parameters for instrument operation (disinfectant, lim-
its, alarms).
Program the DPD value of the Verikit in menu <Installation/
Sensors/Ref. Verification>.
If pH option is installed, program the two buffers you want to use for
calibration in menu <Installation/Sensors/Standards>.
See
Program List and Explanations, p.
Navigate to menu < Maintenance /
3.2.2
Service/Fill system>.
Press [Enter].
The peristaltic pump is activated for
3.2.2.5
1.5 minutes.
Press [Exit] 4 x to go back to the oper-
3.2.2.5
ating mode.
80.
A-96.250.581 / 220616

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMI Codes-II CC and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ami codes-ii tc

Table of Contents