Instrument Setup - Swann AMI Phosphate-II Operator's Manual

Version 5.01 and higher
Hide thumbs Also See for AMI Phosphate-II:
Table of Contents

Advertisement

AMI Phosphate-II

Instrument Setup

4.
A-96.250.641 / 290312
Instrument Setup
After installation according to the checklist proceed as following:
1 Prepare reagents. See
41
2 Insert suction lance/level detectors
3 Lock the occlusion frames of the peristaltic pump.
The peristaltic pump is ready.
4 Turn on sample flow and wait until the flow cell is completely
filled.See
Establish Sample Flow, S. 32
5 Switch on power.
6 Fill system. See
7 Let the instrument run continuously for 1 hour.
Reagents for Measuring Phosphate, S.
A
B
C
D
Fill / Flush Reagent System, S. 33
A
Turn to lock
B
Occlusion frame
C
Rotor
D
Pump tube