Maintenance; Maintenance Schedule - Swann AMI Phosphate-II Operator's Manual

Version 5.01 and higher
Hide thumbs Also See for AMI Phosphate-II:
Table of Contents

Advertisement

AMI Phosphate-II

Maintenance

6.
6.1.
Daily (dirty water)
up to every
2 weeks (clean water)
Monthly
Yearly
By occurrence:
A-96.250.641 / 290312
Maintenance

Maintenance Schedule

WARNING
Stop operation before maintenance.
 Stop sample flow.
 Shut off power of the instrument.
Check sample supply for dirt.
Clean all filters and strainers, if necessary.
Check sample flow
Recommendation: Check photometer with verification kit
Verification, S. 43
Exchange reagent pump tubes.
E015, Valve defective,
E020, FOME dirty:
E022, Reagent empty:
E065, Reagent low:
Cleaning the solenoid valve, S. 50
Cleaning the Photometer, S. 46
Refill / replace Reagents, S. 41
Refill / replace Reagents, S. 41