Maintenance - Swann AMI Phosphate-II Operator's Manual

Version 5.01 and higher
Hide thumbs Also See for AMI Phosphate-II:
Table of Contents

Advertisement

AMI Phosphate-II
Program List and Explanations

3 Maintenance

3.1 Calibration
3.1.5
3.2 Service
3.2.1
3.2.2
3.3 Simulation
3.4 Set Time
A-96.250.641 / 290312
Calibration: Performs a calibration using the standard soluti-
non.Follow dialog on the screen.See
Verification: Performs a verification using the reference kit. Follow
dialog. See
Verification, S. 43
Fill System: Activates the reagent pump.Can be used to fill, flush
or empty the system.
Test alarm relay, relay 1 / 2 or signal output 1/2 by selecting with the
<Enter> key and the up/down keys to change the value. After con-
firming the setting with the <Enter> key, the value is simulated by
the relay/signal output.
Alarm Relay:
Relay 1/2:
Input:
Signal Output 1/2:
Signal Output 3
Magnetic valve 1:
Magnetic valve 2:
At the absence of any key activities, the instrument will switch back
to normal mode after 20 min. If you quit the menu, all simulated val-
ues will be reset.
Adjust date and time.
Calibration, S. 44
Open or closed.
Open or closed.
Open or closed.
Actual current in [mA].
If option is installed actual current in [mA].
Open or closed.
Open or closed.
69

Advertisement

Table of Contents
loading

Table of Contents