Instrument Setup - Swann AMI Hydrogen QED Operator's Manual

Table of Contents

Advertisement

AMI Hydrogen QED

Instrument Setup

4.
Establish
sample flow
A-96.250.791 / 040219
Instrument Setup
1 Open the flow regulating valve [A].
2 Switch on the instrument.
3 The following start-up sequence lasts 8 min, during this time the
instrument is on hold.
HOLD
15:20:18
R1
Start-up
Sequence
R2
25.1 °C
0.0 l/h
4 Adjust the sample flow to 6–20 l/h. The actual flow is shown on
the transmitter display.
A
07:18
27

Advertisement

Table of Contents
loading

Table of Contents