Instrument Setup; Prepare Reagents; Peristaltic Pump - Swann AMI Codes-II CC Operator's Manual

Monitoring system for the automatic, continuous measurement and dosing control of chlorine based on the dpd colorimetric method apha 4500 cl-g and on en iso 7393-2
Table of Contents

Advertisement

AMI Codes-II CC

Instrument Setup

4.
4.1.
4.2.
36
Instrument Setup
After installation according to checklist proceed as following:

Prepare Reagents

1 Prepare reagents. See
2 Insert the suction lances combined with level detector into the
containers.

Peristaltic Pump

The instrument is delivered with opened occlusion frames.
1 Activate the peristaltic pump tubes by closing the occlusion
frame [B].
Refill or replace Reagents, p.
A
Turn to lock
B
Occlusion frame
A
C
Rotor
D
Pump tube
B
C
D
46.
A-96.250.581 / 220616

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMI Codes-II CC and is the answer not in the manual?

This manual is also suitable for:

Ami codes-ii tc

Table of Contents