Figure 63: Switch Initialization Messages (Continued) - Allied Telesis XS900MX Series Installation Manual

Stackable 10gigabit ethernet switches alliedware plus version 5.4.8. for vcstack.
Hide thumbs Also See for XS900MX Series:
Table of Contents

Advertisement

Chapter 7: Stacking with the Default Trunk Ports
Starting base/portmapper...
Received event syslog.done
Starting base/reboot-stability...
Checking system reboot stability...
Starting base/cron...
Starting base/apteryx...
Starting base/appmond...
Starting base/clockcheck...
Starting hardware/openhpi...
Starting hardware/timeout...
Starting base/inet...
Starting base/modules...
Received event modules.done
Received event board.inserted
Received event apteryx.done
Starting network/kermond...
Starting hardware/plugman...
Starting hardware/hardware-done...
Received event hardware.done
Starting network/startup...
Starting base/external-media...
Starting network/stackd...
Starting network/election.timeout...
Starting network/corosync...
Received event network.enabled
Initializing HA processes:
atmfd, auth, cntrd, epsr, hostd, hsl, imi
imiproxyd, lacp, lldpd, loopprot, mstp, nsm, ripd
rmon, sflowd, udldd
Received event network.initialized
10:43:34 awplus-1 HPI: HOTSWAP Pluggable 1.0.27 hotswapped in: 2127931-2
10:43:34 awplus-1 HPI: HOTSWAP Pluggable 1.0.28 hotswapped in: 2127931-2
10:43:42 awplus-1 VCS[1151]: Member 2 (eccd.6ddf.4423) has joined the stack
10:43:43 awplus-1 VCS[1151]: Member 1 (eccd.6ddf.441c) has become the Active
Master
Received event vcs.elected-master
10:43:43 awplus VCS[1151]: Stack Virtual MAC is 0000.cd37.097f
102
Figure 63. Switch Initialization Messages (Continued)
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]
[
OK
]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-xs916mxtAt-xs916mxs

Table of Contents