Parallel Setting - Delta Modulon DPH series User Manual

200-500 kva , three phase
Hide thumbs Also See for Modulon DPH series:
Table of Contents

Advertisement

Equalized Charge Voltage
Charge Current (Max.)
Auto Equalized Charge
Auto Equalized Charge
Equalized Charge Time
Battery Test Fail Voltage
Battery Test Duration
Auto Battery Test Interval
Low Temperature Alarm
High Temperature Alarm
Next Replacement Date

7.10.5 Parallel Setting

Path:
SETUP
After entering the PARALLEL SETTING screen (shown in the figure below), the following
items can be set up. These settings must be carried out by qualified service personnel.
Please contact Delta customer service for assistance.

PARALLEL SETTING

Modulon DPH Series
Item
Interval
Installation Date
UPS-1.1
MEASUREMENT
SETUP
Parallel Setting
Parallel Group ID
1
Description
Set up the equalized charge voltage.
Set up the maximum charge current.
Enable or disable the auto-equalized charge.
Set up the auto equalized charge interval.
Set up the equalized charge time.
Set up the battery test fail voltage. When the battery
voltage is under the test fail voltage, it means battery
fail.
Set up how long the battery test should last.
Set up the battery test interval.
Enable or disable the low temperature alarm. If
enabled, set up the temperature.
Enable or disable the high temperature alarm. If
enabled, set up the temperature.
Record the battery installation date.
Set up the battery replacement date.
MAINTENANCE
LOG IN
EVENT LOG
Administrator
Parallel ID
Common Battery
1
Enable
7-28
10:15
May 25,2018
Bypass

Advertisement

Table of Contents
loading

Table of Contents