Battery Test Duration

Auto Battery Test Interval

Low Temperature Alarm

High Temperature Alarm

Installation Date
Next Replacement Date

7.10.5 Parallel Setting

Path:
SETUP
After entering the PARALLEL SETTING screen*
Please contact Delta customer service for assistance.
NOTE:
information, please refer to
UPS-1.1
PARALLEL SETTING
Item
Parallel
Group ID
Parallel
ID
Item
Set up how long the battery test should last.
Set up the battery test interval.
Enable or disable the low temperature alarm. If enabled,
set up the temperature.
Enable or disable the high temperature alarm. If enabled,
set up the temperature.
Record the battery installation date.
Set up the battery replacement date.
1
*
means that the Administrator password is needed. For password
MEASUREMENT
SETUP
Parallel Setting
Parallel Group ID
1
The UPSs in parallel connection must be assigned the same parallel group
ID No. in order to let the outputs of the parallel UPSs be put in parallel
connection and let the loads be evenly distributed among the parallel units.
might be synchronized but their outputs cannot be connected in parallel.
The UPSs that need to be paralleled must be assigned the same parallel
work.
Description
1
.
MAINTENANCE
LOG IN
EVENT LOG
Administrator
Parallel ID
Common Battery
1
Enable
Description
7-37
7
LCD Display & Settings
10:15
May 25,2018
Bypass

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dph-300k

Table of Contents