Please see the table below for the power module's packing list.
No.
1
2
3
4

5.8.1 Power Module Installation

After following 5.4 Fixing the UPS to firmly fix the UPS in the designated installation area,
follow the following steps to install the power module into the UPS.
1
Confirm the power module's switch is in the lower position (
Modulon DPH Series
1
Item
Power Module
Bracket Ear
M6 Screw
M4 Screw
WARNING:
1. Only qualified service personnel can perform the following installation procedures.
2. The power module is heavy (> 36 kg). At least two people are required for
handling.
3. Please follow UPS capacity to install appropriate number of power modules.
Capacity
Power Module Q'ty
4. To consider the center of gravity, please install the power modules from the top
layer of the power module slot to the bottom layer of the power module slot in
sequence.
(Figure 5-38: Turn the Power Module's Switch to the Lower Position)
2
DPH 200 ~ 500kVA
200kVA/
300kVA/
200kW
300kW
4
6
5-38
3
4
×4
×2
Q'ty
1 PC
2 PCS
4 PCS
8 PCS
400kVA/
500kVA/
400kW
450kW
8
9
).
×8