2. Installation and operation
2.1

Advisory

All products are manufactured and developed to the highest standards and assembled with precision and care. Each product
has been rigorously tested. We constantly strive to develop our products to provide you with the most innovative products
possible.
Please read these installation and operating guidelines carefully prior to installation. These guidelines contain important
information and hazard warnings, which will enable you to install and operate your product safely, economically, and reliably.
Only qualified personnel should carry out the installation in accordance with the latest IET wiring regulations BS7671. All works
should be in line with the Health and Safety at Works Act 1974.
It is important to note that these guidelines are for guidance only and it is the installer's responsibility to satisfy themselves that
the installation procedure is in accordance with good practice, this will then eliminate any potential damage to the product
during or after installation.
If you are unsure on any point then contact Delta Membranes on 01992 523 523 between 8am and 5pm, Monday to Friday or
by email at info@deltamembranes.com before proceeding.
2.2

Intended use

This Delta HLA is designed for use indoors only. Under no circumstances should the product be installed outdoors. Do not
operate the UPS in direct sunlight, in contact with fluids, or where there is excessive dust or humidity.
Be sure the air vents on the UPS are not blocked. Allow adequate space for proper ventilation.
2.3

Installation

It is important to note that these instructions are for guidance only and it is the installer's responsibility to satisfy themselves
that the installation procedure is in accordance with the site conditions and good building practice, to eliminate any potential
damage to the system either during or after installation. The installer should also satisfy themselves that the system can be
installed in conjunction with these guidelines, prior to work commencing.
Please read these instructions in full prior to commencement of the installation. If you are unsure on any point then contact
Delta Membranes on 01992  523  523 between 8am and 5pm, Monday to Friday or by email at info@deltamembranes.com
before proceeding.
The Delta UPS should be installed on a shelf a minimum of 500 mm above FFL.
1.
Remove all packaging and discard.
2.
Wire female euro line socket to the Backup pump.
3.
Plug Backump pump into UPS.
4.
Connect mains power lead to the UPS.
5.
Turn 240V power on at the mains connection, checking supply is present.
6.
Turn on to the unit using the ON/OFF Button
7.
Turn the unit on using the ON Button
3
Delta UPS
WARNING!
The maximum recommended distance of the UPS to the pump chamber is 10 metres..
DMS_IG_E021/E022 0123