Power Module Installation - Delta Modulon DPH series User Manual

Three phase, 100-300 kva
Hide thumbs Also See for Modulon DPH series:
Table of Contents

Advertisement

5.8.1 Power Module Installation

stated in 5.4 Fixing the UPS, continue with the following steps to install the power module
(optional) into the UPS.
1
2
Take out the two bracket ears, four M6 screws and eight M4 screws from the power
module's package.
3
Use the provided eight M4 screws to fix the provided two bracket ears on the two
sides of the power module. Please refer to Figure 5-45.
Modulon DPH Series
WARNING:
installation procedures.
2. The power module is heavy (> 36 kg). At least two people are required for
handling.
3. Please follow your UPS capacity to install the correct number of power
modules. Please refer to the table below.
UPS
Capacity
Power
Module Q'ty
4. To consider the center of gravity, please install the power modules from the
top layer of the power module slot to the bottom layer of the power module
slot in sequence.
100kVA/
150kVA/
100kW
150kW
2
3
5-40
200kVA/
250kVA/
200kW
250kW
4
5
).
300kVA/
300kW
6

Advertisement