To Add Io Channel Blocks To A Control Module Chart - Honeywell Experion C300 User Manual

Hide thumbs Also See for Experion C300:
Table of Contents

Advertisement

Add an I/O Channel to a Control Module

To add IO Channel blocks to a Control Module chart

To add IO Channel blocks to a Control Module chart
Step
1
Make sure a Control Module (CM) chart
is open.
Double-click the CM in the Project Tree
to open your CM chart so function blocks
may be added.
See
Creating and Saving a Control
Module.
2
From the appropriate Library Tree group,
drag and drop the desired block (or
blocks) to the Control Module Control
Drawing (such as an AICHANNEL block
from the IOCHANNEL group).
TIP
You can drag and drop Series C or PMIO Input/Output Channel (IOC) blocks directly
from IO Ms added to the Project tab to the Control Module.
You can not add IOC blocks to Control Modules already assigned to a Fieldbus
Interface Module (FIM).
3
Repeat Step 2 as many times as necessary to create the desired blocks for your
control strategy.
4
Create your control strategy by connecting the function blocks using the Insert wire
option.
REFERENCE - INTERNAL
For details to connect function blocks, see Connecting and disconnecting
blocks in the Control Building Guide.
If you are building a control strategy to include insertion points, refer to
Creating a strategy to use insertion points in the Control Building Guide.
74
Action
Experion C300 Controller User's Guide
Honeywell
Result
The Control Module (CM) chart is open
so that function blocks may be added.
Desired block is shown in reverse video
on the tree.
The new function block appears on the
Control Module chart.
R301.1
11/06

Advertisement

Table of Contents
loading

Table of Contents