This procedure assumes that the C300 Controller is installed and capable of
•
communicating with the Server.
Considerations
All illustrations used in the procedure are for example purposes only.
To load a IOLINK block
Step
1
Click desired IOLINK block icon in
Project tab.
2
Click Tools->Load. Or, click the
load button in the toolbar.
Also, you can right click on the IOLINK
block icon to select Load.
R301.1
11/06
Action
Experion C300 Controller User's Guide
Honeywell
Load components from Project
To load a IOLINK block
Result
Selects and highlights the component.
Calls up Load Dialog box
149