To Install A Partner Secondary C300 Controller - Honeywell Experion C300 User Manual

Hide thumbs Also See for Experion C300:
Table of Contents

Advertisement

C300 Controller installation

To install a partner secondary C300 Controller

Both the primary and partner secondary controllers must be connected to the same
pair of FTE Control Firewall (CF9) assemblies.
To install a partner secondary C300 Controller
Step
1
If the primary C300 FB already exists in Control Builder and it is configured
as a redundant controller, make sure the auto-sync parameter is set to
"Disabled."
2
Refer to appropriate site location drawings for the specified installation
location, controller Device Index (FTE address) and wiring diagrams.
3
Select the mounting location on carrier and align mounting holes in IOTA with
screw hole locations on the carrier.
4
Be sure component side of IOTA is facing up. Secure IOTA to carrier using
screws, washers and spacers provided. Insert spacers and washers between
bottom of IOTA and top of carrier.
5
Connect FTE-A and FTE-B Ethernet link cables to the RJ-45 connectors on
C300 IOTA board.
The Yellow Cat5 cable connects to the "FTEA" connector on the IOTA.
The Green Cat5 cable connects to the "FTEB" connector on the IOTA.
28
Experion C300 Controller User's Guide
Honeywell
Action
R301.1
11/06

Advertisement

Table of Contents
loading

Table of Contents