Table 3 C300 Controller IOTA Board Connector Summary
C300 IOTA Board
F1
IOL1A, IOL1B (BLUE)
IOL2A, IOL2B (GRAY)
FTEA, FTEB
REDUNDANCY
MEMORY HOLD-UP
GPS (Currently not used)
FTE DEVICE INDEX
100, 10, 1
Prerequisites
Before you install the C300 Controller you should have:
A control cabinet installed with appropriate carrier hardware for mounting Series C
•
control hardware.
A Series C power supply and optional battery backup hardware installed in the
•
cabinet.
Installed pair of Control Firewall (CF9) assemblies.
•
The necessary parts for installing C300 Controller to the control system. See Series
•
C System Cabling in the Control Hardware Planning Guide for cable hardware
R301.1
11/06
Fuse
Redundant IOLINK connectors for IOLINK 1 and
IOLINK 2
Fault Tolerant Ethernet (FTE) network
connectors
FTE A network cables are Yellow.
FTE B network cables are Green.
Redundant private path cable connector.
Redundancy cable is
Battery Backup cable connector
Battery cable is a twisted pair.
GPS cable connector
Three rotary decimal switches used to set the
FTE network address (Device Index) of the
controller.
See Step 9 of the C300 Controller Installation
procedure for setting the address.
Experion C300 Controller User's Guide
Honeywell
C300 Controller installation
C300 Controller assembly
Description
Orange
23