Table 3 C300 Controller Iota Board Connector Summary - Honeywell Experion C300 User Manual

Hide thumbs Also See for Experion C300:
Table of Contents

Advertisement

Table 3 C300 Controller IOTA Board Connector Summary

C300 IOTA Board
F1
IOL1A, IOL1B (BLUE)
IOL2A, IOL2B (GRAY)
FTEA, FTEB
REDUNDANCY
MEMORY HOLD-UP
GPS (Currently not used)
FTE DEVICE INDEX
100, 10, 1
Prerequisites
Before you install the C300 Controller you should have:
A control cabinet installed with appropriate carrier hardware for mounting Series C
control hardware.
A Series C power supply and optional battery backup hardware installed in the
cabinet.
Installed pair of Control Firewall (CF9) assemblies.
The necessary parts for installing C300 Controller to the control system. See Series
C System Cabling in the Control Hardware Planning Guide for cable hardware
R301.1
11/06
Fuse
Redundant IOLINK connectors for IOLINK 1 and
IOLINK 2
Fault Tolerant Ethernet (FTE) network
connectors
FTE A network cables are Yellow.
FTE B network cables are Green.
Redundant private path cable connector.
Redundancy cable is
Battery Backup cable connector
Battery cable is a twisted pair.
GPS cable connector
Three rotary decimal switches used to set the
FTE network address (Device Index) of the
controller.
See Step 9 of the C300 Controller Installation
procedure for setting the address.
Experion C300 Controller User's Guide
Honeywell
C300 Controller installation
C300 Controller assembly
Description
Orange
23

Advertisement

Table of Contents
loading

Table of Contents